Categories
All Projects Industrial Our Projects

“CHINGGIS KHAAN” INTERNATIONAL AIRPORT HANGAR

The hangar is designed to accommodate the simultaneous repair and maintenance of two Boeing 787-9 Dreamliner aircraft.

Location: Tuv province, Sergelen sum, Khushgiin Khundii Airport, Ulaanbaatar, Mongolia.
Client: CAAM – Civil Aviation Authority of Mongolia.
Capacity: 2 Boeing 787-9 aircraft.
Contract Type: Turnkey.
CFA: 14’400м2
Timeframe: 2018-2020

Categories
All Projects Industrial

MCS COCA COLA’S NEW PLANT

The MCS Coca-Cola plant has an 11’400m2 area for the production of beverages, water, tea and juice, and a new wastewater treatment and recycling plant. The plant treats 800-1000 tons of wastewater per day.

Location: Bayanzurkh District, Ulaanbaatar, Mongolia.
Client: MCS Coca Cola LLC.
Capacity: Production of 18,000 bottles of beverages per hour.
Contract Type:Construction Main Contractor,
CFA: 11’400 м2
Timeframe: 2008-2009

Categories
All Projects Industrial

TIGER GREENFIELD BREWERY FACTORY

MCS Tiger, 4600 sqm of beer brewing factory meeting international standards was developed within a year from 2006 to 2007. This factory is capable of brewing 300,000 hectoliters beer per year. The brewery was built with the objective to manufacture global brands in Mongolia. The brewery is fully-automated and equipped with the German Krones AG bottline line for packaging cans, PET bottles and glass bottles.

Location: Bayanzurkh District, Ulaanbaatar, Mongolia.
Contract type: Site management local support.
СFA: 4’600m2
Timeframe: 2006-2007

Categories
All Projects Industrial

COAL HANDLING PLANT FOUNDATION

With its Coal handling and preparation plant (“CHPP”) in oparation at UHG since 2011, MMC is the first washed coal producer of the country. They CHPP, the first of its kind in Mongolia and set to be one of the largest coking coal processing plants in the world, was designed Sedgman Engineering Technology from Australia, one of the world leaders in the coal processing in material handling technology. The first and second modules of this CHP commenced commercial operations in 2011 and 2012 respectively. MMC’s total name-plate ROM coal proccessing capacity reached and 15Mtpa by the successful commissioning of the plant’s third module in 2013.

Location: Ukhaa Khudag Mining Umnugobi, Mongolia.
Client: Energy Resources LLC.
Contract Type:Construction Main Contractor.
CFA: 8’470 м2
Timeframe: 2010-2011

Categories
All Projects Industrial

MINING HEAVY EQUIPMENT WORKSHOP

The mining heavy equipment workshop was designed and constructed to be the most modern and advanced mining workshop facility in Mongolian mining at the time of completion. The facility in-volves the technologically advanced repairing equipment, washing system, oil distribution system, exhausting system and compressed air system.

Location: Ukhaa Khudag Mining Umnugobi, Mongolia.
Client: Energy Resources LLC.
Contract Type:Construction Main Contractor.
CFA: 4’332 м2
Timeframe: 2011-2012