Categories
One of Us

Ch. Amarbayasgalan

#One-of-Us

Categories
One of Us

S. Chinzorig

#One-of-Us

Categories
One of Us

J. Orgil

#One-of-Us

Categories
All Projects Commercial

SHANGRI-LA COMPLEX PROJECT

Shangri-La Hotel is located right in the heart of the city centre and it is an ideal base for both business and leisure travellers. The project has introduced many construction technologies to the national construction sector including the longest spanning in-situ casted reinforced concrete beam in Mongolia, the biggest ballroom, the first unitized curtain wall system etc.

Location: City Center, Ulaanbaatar, Mongolia.
Client: Shangri-La Ulaanbaatar LLC.
Contract Type: Construction Main Contractor.
CFA: 181’189м2
Timeframe: 2010-2016

Categories
All Projects Residential

ASEM VILLAGE PROJECT

The 11th ASEM Summit was held in 2016 in Mongolia. There is a need to build a campus in our country to accommodate a total of 53 leaders of national and international organizations attending the meeting. In 2015, the tender was announced and MCS Property was selected as the company capable of building 53 quality houses in a short period of time. In just over a year, ASEM Village has been built by MCS Property and put into full use of many advanced construction technologies and materials, including geothermal systems, ger automation systems, and EPDM roof waterproofing. ASEM Village, another Vista brand project, is located in the most peaceful part of the city, Khurkhreen Am. Built with modern architecture and engineering solutions.

Location: Khurkhreen Am, Ulaanbaatar, Mongolia.
Client: Sky Resort LLC.
Capacity: Separate accommodation for the top Government officials of 53 countries with Clubhouse building for leisure and golf services.
Contract Type: Turnkey.
CFA: 26’000m2
Timeframe: 2015-2016

Categories
All Projects Mining

OYU TOLGOI UNDERGROUND CONSTRUCTION PROJECTS

The launch of the world’s fifth-largest underground mining project is a major milestone that demonstrates the company’s ability to work internationally, both as a company and as an engineer.

The Oyu Tolgoi underground mine, located in Khanbogd soum, Umnugovi Province, Mongolia, is located at a depth of 1,300 meters below the surface and is a 200 km long tunnel system with an average cross-section of 6×6 meters. MCS Property LLC has been cooperating with Jacobs Engineering, the world’s largest construction company, since 2016. The Critical Facilities Construction Project is an important project that will allow for the uninterrupted operation of the underground mine and the next phase of the main mine construction.

Categories
All Projects Commercial

GRANDKHAAN AUTOMOTIVE PROJECT

“Toyota Auto Showroom and Maintenance Complex” commissioned by Top Motors LLC is an exhibition hall with an area of 8615m2 with a capacity of 10 cars at a time and a capacity to repair and service 20 cars at the same time.

Location: Bayangol District, Ulaanbaatar, Mongolia.
Client: Top Motors LLC.
Contract Type: Construction Main Contractor.
CFA: 7742м2
Timeframes: 2020-2021

 

Categories
All Projects Commercial

INTERMED INTERNATIONAL HOSPITAL PROJECT

Intermed hospital was built in 2014 – it is a project that aims to upgrade the provided health and learning services in Mongolia. The hospital has the capacity to receive around 90 inpatients at a time, and has 16 outpatient clinics. Intermed is the first and only JCI accredited hospital in Mongolia.

Location: Khan-Uul District, Ulaanbaatar, Mongolia.
Client: Intertional Medical Center LLC.
Contract Type: Construction Main Contractor.
CFA: 12’731м2
Manhour: 1’292’647
Timeframe: 2011-2014

Categories
All Projects Commercial

ORCHLON HIGH SCHOOL PROJECT

With successful completion and delivery of high school Orchlon became the first high school in Mongolia that offers S.T.E.A.M program through its new facilities and laboratories (Science, Technology, Engineering, Art & mathematics in relation to the Cambridge program.
The high school with capacity of 500 students had unique architectural and engineering design with its 32m span overhead bridge connection to the main facility and the façade that has both modern and cultural perceptions.
It has been great achievement for the project team to successfully complete the delivery the project to the client within 7 months from the commencement.
Mostly important, LTI free 328’762 hours were spent on projects.

Location: Khan-Uul District, Ulaanbaatar, Mongolia.
Client: Orchlon International School LLC.
Contract Type: Construction Main Contractor, Design Author.
CFA: 8’062м2
Manhour: 1’292’647
Timeframe: 2019.03-2019.11

Categories
All Projects Industrial Our Projects

“CHINGGIS KHAAN” INTERNATIONAL AIRPORT HANGAR

The hangar is designed to accommodate the simultaneous repair and maintenance of two Boeing 787-9 Dreamliner aircraft.

Location: Tuv province, Sergelen sum, Khushgiin Khundii Airport, Ulaanbaatar, Mongolia.
Client: CAAM – Civil Aviation Authority of Mongolia.
Capacity: 2 Boeing 787-9 aircraft.
Contract Type: Turnkey.
CFA: 14’400м2
Timeframe: 2018-2020